-
Phase III waste gas treatment project of Machong wa
The project is located in Dongguan City, Guangdong Province, with a capacity of 33000m / h. Chemical washing method is adopted, and the construction period is 2 months, The project mode is EPC turnkey project. At present, the system operates normally -
Waste gas project of spray painting workshop of Lia
The project is located in Lianyungang City, Jiangsu Province, with a waste gas volume of 80000m / h; Photocatalytic oxidation process is adopted, and the construction period is one In May, the project mode is EPC turnkey project. At present, the sy
- 共 1页2条记录